How to Plan a Material Handling System: Step-by-Step Guide

A material handling system is more than a collection of machines. It is the sequence of storage locations, transfer points, handling equipment, people and procedures that move materials through a facility. Poor system planning can shift a bottleneck from one department to another rather than eliminating it.

This step-by-step guide explains how to plan a material handling system before choosing hardware. If you need a definition and overview of system types first, see Fredon’s material handling systems explained.

Step 1: Define the Business and Operational Goals

Choose measurable outcomes, such as fewer handling touches, improved order throughput, shorter replenishment time, safer material positioning or better storage access. A broad goal like ‘improve efficiency’ will not tell you whether a proposed project works.

Set a baseline and target for the same process. Identify decision-makers, front-line users, maintenance personnel and anyone responsible for safety or facility changes.

Step 2: Map the Existing Material Flow

Draw the path of a representative item from receiving to storage, production or picking, and shipping. Mark equipment, travel distance, delays, manual transfers, queues and changes in elevation. Include exceptions such as rework, damaged products, returns and seasonal volume peaks.

Walk the route with the people who perform the work. A drawing may show the intended process while the actual operation includes temporary staging or workarounds. For practical diagnosis, Fredon’s material handling audit guide offers a structured review.

Step 3: Record Load and Capacity Requirements

For every load family, record weight, dimensions, center of gravity where relevant, packaging, stability, movement frequency and required destination. Estimate peak units per hour or shift and how much variation the system must absorb. Averages alone can hide high-demand periods.

Different unit loads may need different equipment. A pallet handling plan does not necessarily solve small-parts delivery, oversized assemblies or drum handling requirements.

Step 4: Document Facility Constraints

Measure aisles, floor conditions, ceiling clearance, doors, columns, docks, existing machines and electrical or utility availability. Identify pedestrian routes, emergency access and areas that cannot be shut down for installation. Include existing equipment that must remain in service.

Structural capacity, rack loading, overhead support and building alterations may require qualified design professionals or jurisdictional approvals. These conditions should be verified early rather than discovered after equipment has been ordered.

Step 5: Evaluate Alternative Equipment Concepts

Develop at least two reasonable concepts when practical. A bottleneck might be addressed by changing storage positions, introducing a lift table, using mobile carts, improving a dock interface or integrating a fixed movement system. Consider whether the project requires standard equipment or a custom arrangement.

Compare operational performance, safety, maintainability, flexibility and implementation difficulty. Fredon’s material handling equipment categories illustrate different types of solutions.

Step 6: Review Safety and Operator Interaction

A proposed system should be evaluated for pedestrian exposure, equipment traffic, pinch points, elevated loads, visibility, guarding, transfer-height mismatches and maintenance access. Clarify who will operate the equipment and what training or authorization will be required.

Check manufacturer requirements and applicable standards for each component. Safety planning is not a box to check after layout approval; changes may affect space and equipment choice.

Step 7: Model Cost and Measurable Benefits

Estimate total installed cost including equipment, freight, utilities, commissioning, training and necessary building changes. Add energy, service, consumables, repairs and downtime over the evaluation period. Compare improvements using observed handling time, damage, throughput and other real baseline data.

Be careful not to count the same benefit twice—for example, treating a shorter task as both labor savings and additional cash revenue without a sound basis. Use the material handling ROI guide as a framework.

Step 8: Pilot, Specify and Commission

Where possible, test the critical movement or station arrangement before ordering an integrated solution. Convert the preferred concept into a specification describing loads, cycle rates, interfaces, safeguards, documentation, site preparation and acceptance criteria.

Agree on responsibility for installation, testing and operator training. After startup, measure the same indicators used in the baseline and make adjustments if the system performs differently from expectations.

Step 9: Plan for Growth and Maintenance

A handling system should accommodate realistic changes in volume, inventory mix, product packaging and layout. Leave reasonable access for inspections and repairs, identify wear parts and confirm service requirements. Maintain updated drawings and operating instructions.

Review performance periodically after changes to throughput or product mix. A system that fit the initial operation may become a bottleneck if other parts of the facility expand.

For a wider look at storage, transport, lifting and positioning, see our complete guide to material handling equipment.